Hi
Has anyone replaced their outhaul when the original one has a block running in the boom?
The set up appears to be that the rope comes in the goose neck end of the boom then up the boom round a 'floating' block and back to the goose neck end of the boom where it is anchored. The rope from the 'fixed' end of the block then comes out of the boom at the aft end and fixes to the sail.
The issue is that the rope is tied to an anchor point at the goose neck end of the boom. The options appear to be
1 - Drill out the rivets the hold the goose neck in and replace the rope. Not a preferred option
2 - Drill out the rivets that hold the anchor point and do away with the block
Has anyone had a similar set up on their Outhaul and how did you replace the rope?
Many thanks for any help
Andy
Jago
Parker 235/04